Subdivision
Lupin Road Subdivision Otaki Stage 2
Project Overview: Earthworks, drainage and roading for subdivision in Otaki. Work in sand and peat in challenging wet conditions with houses close to and around subdivision.
Roading
2,127 m2 subgrade preparation
439 m3 AP65 Subbase
273 m3 AP40 Basecourse
1,588 m2 Asphalt sealing
188 m2 exposed aggregate footpath
Berm preparation and grassing
Earthworks
1,340 m3 cut to fill.
1,350 m3 topsoil strip, stockpile, and respread.
15,387 m2 topsoil surface prepared and grassed.