Project Overview: Earthworks and stormwater drainage for stage 3 of windfarm construction including silt ponds, topsoil stripping and stockpiling, cut to fill, cut to waste, rockfill, removal of unsuitable, preparation of turbine platforms, undercut of turbine foundations, topsoiling and reinstatement, subsoil drainage, tirm and prepare subgrade for roads, concrete culverts, & table drains for roads.

Drainage

  • Culvert crossings

  • Concrete culverts(up to 1200dia)

  • Subsoils, silt ponds and table drains

  • Gully piping

Earthworks

  • 110,000 m3 cut to fill and cut to waste

  • 45,000 m3 topsoil stripping

  • 3 km of tracks

  • Varied materials to deal with

  • Managed by Goodmans