Windfarm
Tararua Windfarm Manawatu
Project Overview: Earthworks and stormwater drainage for stage 3 of windfarm construction including silt ponds, topsoil stripping and stockpiling, cut to fill, cut to waste, rockfill, removal of unsuitable, preparation of turbine platforms, undercut of turbine foundations, topsoiling and reinstatement, subsoil drainage, tirm and prepare subgrade for roads, concrete culverts, & table drains for roads.
Drainage
Culvert crossings
Concrete culverts(up to 1200dia)
Subsoils, silt ponds and table drains
Gully piping
Earthworks
110,000 m3 cut to fill and cut to waste
45,000 m3 topsoil stripping
3 km of tracks
Varied materials to deal with
Managed by Goodmans