Project Overview: Earthworks, drainage and roading for new subdivision in Otaki. Work in sand and peat.
Interesting Points
11,000 m3 cut to fill
10,000 m3 topsoil strip, stockpile, and respread
5,300 m3 building site excavations
2,127 m2 subgrade preparation & Asphalt sealing
Construction of permanent lake, which acted as the main silt control for the job.
Live sewer to contend with and maintain