Roading

SH3 Muggeridge Road South Realignment

Project Overview: Realignment of 1.5km of live road.  Work included bulk earthworks, drainage, stream diversion, traffic management, fencing & construction of stock underpass. 427,000 m3 of earthworks. Drainage included 375-600mm diameter stormwater. Rip rap scour protection. 100% of environmental controls including silt ponds, silt fencing and grit traps.  Worked in accordance with Taranaki Regional Council requirements. Installation of 1350mm diameter steel corrugated culvert in very deep fill. Paving by Higgins Contractors. Location - SH3 Muggeridge Road

Interesting Points

  • Drainage included 375mm and 600mm diameter stormwater lines

  • 30m of flume was installed

  • Over 1.4km of aggregate drains

  • 16,780m3 topsoil strip, stockpile and respread

  • 280,000m3 cut to fil

  • 50,000m3 cut to waste

  • 57,000m3 unsuitable

  • 23,000m2 subgrade preparation