Opiki Bridge Stopbank
Project Overview: Construction of 1.4km of stopbank involving clearing vegetation, removal of topsoil, excavation of cuts, borrow areas, benches and surface drainage, carting of excavated material, formation and shaping of the new stopbank in layers, control of surface water, spreading of vegetation, spreading of topsoil and grass, and general maintenance work.
Interesting Points
Topsoil stripping from cut and borrow areas – 21,000m2
Cut to fill with hauls up to 1.7km – 10,500m3
Shape, trim, topsoil, and grass – 16,000m2